Template:Age in years and days
This template uses Lua: |
This template returns the number of full years and surplus days between two specified dates. If only one date is entered, the template returns the number of full years and surplus days between the specified date and today's date.
This template does not generate a sort key. In a sortable table, use {{ayd}} which redirects to {{age in years and days nts}}.
Usage
lembaEach date can be entered in a single parameter, or each date can be entered as three parameters: year, month, day.
{{age in years and days|15 May 2010}}
→ 14 years, 196 days{{age in years and days|12 Aug 2003|24 Sep 2011}}
→ 8 years, 43 days{{age in years and days|1989|7|23}}
→ 35 years, 127 days{{age in years and days|1989|7|23|2003|7|24}}
→ 14 years, 1 day{{age in years and days|2007-03-02|2008-03-02}}
→ 1 year, 0 days
An error is shown if an entered date is not valid (1900 was not a leap year).
{{age in years and days|31 January 1892|29 February 1900}}
→ Error: Second date should be year, month, day
Options
lembaThe default is to separate years and days with a comma. The separator is "and" if |sep=and
is used.
The default calculates an age—the day of the second date is not included in the calculation. A duration including the second date is calculated if |duration=on
is used.
{{age in years and days|1 Jan 2011|31 Dec 2012}}
→ 1 year, 365 days{{age in years and days|1 Jan 2011|31 Dec 2012|sep=and}}
→ 1 year and 365 days{{age in years and days|1 Jan 2011|31 Dec 2012|duration=on}}
→ 2 years, 0 days
TemplateData
lembaReturns the number of full years and surplus days between two specified dates (or, if only one date is entered, between the specified date and today's date)
Parameter | Description | Type | Status | |
---|---|---|---|---|
Earlier date | 1 | The earlier date being compared | Date | required |
Later date | 2 | The later date being compared
| Date | suggested |
Separator | sep | Defines a custom separator between the years and days
| String | optional |
Duration? | duration | Set to "on" to include the second date in the calculation; will return a result one higher than if left off | Boolean | optional |